valueequityanalysis.com

Independent, business-by-business valuations built from company filings — owner earnings, a ten-year outlook, and a bear / base / bull range. Search a ticker to see our estimate of what the business is worth.

Not investment advice. We are not registered investment advisers, and the people behind this site may hold or trade positions in companies analyzed here. Full disclosures.

ASPEN AEROGELS INC (ASPN) stock intrinsic value fair value estimate & owner earnings analysis

Margin of safety$2.00 ComplexityHigh Updated
-$2.70 $7.90
bear -$2.70 base $4.00 bull $7.90 margin of safety $2.00 market price* $5.19
Business condition attached to the margin of safety Thermal-barrier revenue stabilizing for two consecutive quarters (no further sequential decline) with gross margin recovering above roughly 25%, evidencing that the single-plant cost base has been right-sized to current, GM-dependent volumes rather than continuing to erode.
Aspen Aerogels makes aerogel-based insulation materials sold into two very different markets. The older business, Energy Industrial, sells pipe and equipment insulation to oil, gas, chemical and LNG facilities — a roughly two-decade-old franchise that generated $102 million of revenue in 2025 and that management expects to grow again in 2026 on petrochemical and refinery project demand. The newer business, Thermal Barrier, makes fire-and-heat barrier components for electric-vehicle battery packs, sold overwhelmingly to General Motors for its Ultium platform, with smaller volumes to Toyota, Scania, and a European battery joint venture. Thermal Barrier grew from a small base to $307 million in 2024 as GM ramped Ultium output, then fell 45% to $169 million in 2025 as GM slowed EV production, and management expects a further decline in 2026. Two facts from that swing matter for what the shares are worth. First, GM is not contractually obligated to buy any minimum quantity of these components and can end the arrangement at will — the relationship is a real business, but not a guaranteed one. Second, between 2022 and 2024 the company spent roughly $290 million building a second manufacturing plant in Statesboro, Georgia to serve EV demand that didn't materialize on the expected schedule; construction was halted in early 2025 and the entire project was written off and put up for sale. That was a real, cash-funded capital-allocation mistake, not an accounting technicality, and it's a reason for caution about how future growth spending gets judged. All production is now back at the company's original single facility in East Providence, Rhode Island (which also draws on a Chinese contract manufacturer for extra capacity); a fire there in February 2026 damaged one of two emissions-control units, underscoring what single-site concentration means in practice. Looking at the actual cash the business has thrown off — operating cash flow adjusted for working-capital swings, stock-based compensation, and the capital spending genuinely needed to sustain the existing plant (separating out the money poured into the now-abandoned second plant, which is treated as discretionary growth spending regardless of whether it succeeded) — Aspen has produced a per-share cash loss in nine of the last ten years. The exception, 2024, produced about $0.70 per share of owner earnings at the peak of GM shipments. 2025 was back to a loss of roughly $0.75 per share; the year's much larger headline net loss was driven mainly by the non-cash plant write-off, which is correctly excluded from this cash-based figure but is exactly the kind of one-time capital destruction that belongs in a cautious read of the business's history. Across the ramp, the peak, and the correction — the only full cycle this newer business has been through — the demonstrated level of owner earnings is modestly negative. Three paths from here: If GM continues to scale back Ultium volumes without a pickup elsewhere, and the single-plant cost structure doesn't shrink enough to compensate even after the cost cuts already under way, the business keeps burning cash for years. After accounting for existing debt (about $105 million), that path leaves the shares worth less than nothing today. In a middle path, the cost reductions and lower planned capital spending management has already begun show results, Energy Industrial grows modestly as guided, and Thermal Barrier volume stabilizes near its reduced, GM-dependent level rather than recovering or falling further. That path gets the business to modest, sustainable per-share earnings over time, and points to a value near $4 per share. In a stronger path, the same cost and capital discipline pays off faster and Energy Industrial grows a bit more than expected — this case does not require GM's EV volumes to recover, only that the company executes on what it already controls — and it points to a value near $8 per share. Because so much of the outcome still depends on one customer's production decisions, which Aspen has no contractual claim on, and because management has already shown it can misjudge a very large capital commitment, the margin-of-safety price sits at a meaningful discount to the middle estimate and assumes evidence that the business has actually stabilized.
Fiscal yearOwner's earningsMethodology
2025 -$0.75 ▼
OE = CFO − ΔWC − SBC − maintenance capex. CFO=$32,872K; ΔWC (net cash effect of changes in operating assets/liabilities per CF statement)=+$48,558K (AR/inventory/prepaid unwound as revenue fell 40%, a one-time release, correctly stripped out); SBC=$8,628K; capex=$37,449K; revenue declined YoY ($452,699K→$271,103K) so growth capex=$0 and maintenance capex=capex=$37,449K (consistent with the abandonment of the Statesboro, GA expansion plant — no further growth capex program exists). OE=32,872−48,558−8,628−37,449=−$61,763K; diluted shares=82,328,484; OE/sh=−$0.75. Reconciliation: NI(−389,552)+D&A(45,157)+other non-cash(320,081, incl. $291,626K non-cash impairment and $18,162K loss on disposal of the abandoned Statesboro plant, debt-related non-cash items, deferred taxes)+ΔWC(48,558)=32,872=CFO exactly (0% gap). Source: FY2025 10-K, accession 0001193125-26-106453.
2024 $0.70 ▼
OE = CFO − ΔWC − SBC − maintenance capex. CFO=$45,549K; ΔWC=$(50,958)K (AR (39,356); Inv (8,362); Prepaid (19,835); AP 7,341; Accrued 11,855; Deferred rev (117); OpLease (2,484)); SBC=$12,855K; capex=$86,262K. Same judgment override (cumulative Statesboro construction-in-progress reached $323.6M by year-end 2024, i.e. this capex still substantially funded the plant later abandoned): maintenance capex set at ~6% of revenue = $27,162K; remainder ($59,100K) is growth capex for the now-abandoned project. OE=45,549+50,958−12,855−27,162=$56,490K; diluted shares=80,306,690; OE/sh=$0.703 — the only year in the observed history with positive owner earnings, driven by peak thermal-barrier volume with GM. Reconciliation: NI(13,375)+D&A(22,526)+SBC(12,855)+other non-cash(47,751: accretion of interest on convertible note 7,083 + amortization of convertible note issuance costs 24 + amortization of debt issuance costs 1,139 + amortization of debt discount 443 + loss on extinguishment of debt 27,487 + deferred financing costs written off 1,829 + provision for bad debt 247 + impairment of PP&E 7,613 + reduction of ROU asset 1,886)+ΔWC(−50,958)=45,549=CFO (matches exactly). Included as part of the valuation anchor window (2023–2025), representing the peak of the demonstrated thermal-barrier ramp. Source: FY2024 10-K, accession 0000950170-25-029252.
2023 -$0.53 ▼
OE = CFO − ΔWC − SBC − maintenance capex. CFO=$(42,612)K; ΔWC=$(31,167)K (AR (12,552); Inv (16,651); Prepaid (7,401); AP 4,583; Accrued 6,808; Deferred rev (3,530); OpLease (2,424)); SBC=$10,954K; capex=$175,455K. Same judgment override as FY2022 (capex overwhelmingly for the now-abandoned Statesboro plant): maintenance capex set at ~6% of revenue = $14,323K; remainder ($161,132K) is growth capex for the abandoned project. OE=(42,612)+31,167−10,954−14,323=−$36,722K; diluted shares=69,439,034; OE/sh=−$0.529. Reconciliation: NI(−45,811)+D&A(15,318)+SBC(10,954)+other non-cash(8,094: accretion of interest on convertible note 4,403 + amortization of convertible note issuance costs 37 + amortization of debt discount 888 + provision for bad debt (93) + reduction of ROU asset 2,859)+ΔWC(−31,167)=−42,612=CFO (matches). Excluded from the valuation anchor as distorted by the now-abandoned plant construction. Source: FY2023 10-K, accession 0000950170-24-028127.
2022 -$1.94 ▼
OE = CFO − ΔWC − SBC − maintenance capex. CFO=$(94,399)K; ΔWC=$(38,165)K (AR (37,042); Inv (10,551); Prepaid (3,155); AP 5,318; Accrued 5,184; Deferred rev 4,525; OpLease (2,444)); SBC=$9,385K; capex=$177,974K. Judgment override of the mechanical Δrevenue growth-capex formula: virtually all 2022 capex funded construction of the second (Statesboro, GA) plant, which was never completed and was fully impaired/sold in 2025 — using the historical capex ratio on revenue growth would misclassify this as 'maintenance.' Maintenance capex is instead set at ~6% of revenue (the pre-expansion single-facility run-rate) = $10,822K; the remaining $167,152K is growth capex for the now-abandoned project. OE=(94,399)+38,165−9,385−10,822=−$76,441K; diluted shares=39,363,114; OE/sh=−$1.942. Reconciliation: NI(−82,738)+D&A(9,222)+SBC(9,385)+other non-cash(7,897: accretion of interest on convertible note 5,110 + amortization of convertible note issuance costs 32 + provision for bad debt 115 + reduction of ROU asset 2,640)+ΔWC(−38,165)=−94,399=CFO (matches). Excluded from the valuation anchor as distorted by the now-abandoned plant construction. Source: FY2022 10-K, accession 0000950170-23-008476.
2021 -$1.39 ▼
OE = CFO − ΔWC − SBC − maintenance capex. CFO=$(18,628)K; ΔWC=$6,033K (AR (4,643); Inv 1,112; Prepaid (2,324); AP 7,379; Accrued 6,983; Deferred rev (543); Other liab (434); OpLease (1,497)); SBC=$5,176K; capex=$13,778K; revenue grew YoY ($100,273K→$121,622K, +$21,349K); growth capex=6.05%×21,349=$1,292K; maintenance capex=clamp(13,778−1,292,0,13,778)=$12,486K. OE=(18,628)−6,033−5,176−12,486=−$42,323K; diluted shares=30,433,154; OE/sh=−$1.391. Reconciliation: NI(−37,094)+D&A(9,440)+SBC(5,176)+other non-cash(−2,183: gain on debt extinguishment (3,734) + amortization of debt issuance costs 18 + provision for bad debt (85) + reduction of ROU asset 1,618)+ΔWC(6,033)=−18,628=CFO (matches). Last full year before the GM thermal-barrier program scaled; not used in the valuation anchor. Source: FY2021 10-K, accession 0001564590-22-007814.
2020 -$0.52 ▼
OE = CFO − ΔWC − SBC − maintenance capex. CFO=$(9,924)K; ΔWC=$(4,622)K (AR 16,231; Inv (4,331); Prepaid (716); AP (7,149); Accrued (4,173); Deferred rev (3,814); Other liab 434; OpLease (1,104)); SBC=$5,004K; capex=$3,416K; revenue declined YoY ($139,375K→$100,273K) so growth capex=$0, maintenance capex=capex=$3,416K. OE=(9,924)+4,622−5,004−3,416=−$13,722K; diluted shares=26,377,652; OE/sh=−$0.520. Reconciliation: NI(−21,809)+D&A(10,198)+SBC(5,004)+other non-cash(1,305: amortization of debt issuance costs 9 + provision for bad debt 325 + reduction of ROU asset 971)+ΔWC(−4,622)=−9,924=CFO (matches). Pre-transformation legacy business (COVID-affected); not used in the valuation anchor. Source: FY2020 10-K, accession 0001564590-21-012925.
2019 -$0.14 ▼
OE = CFO − ΔWC − SBC − maintenance capex. CFO=$(1,054)K; ΔWC=$(1,420)K (AR (6,689); Inv (1,450); Prepaid (84); AP 141; Accrued 4,344; Deferred rev 3,392; Other liab (56); OpLease (1,018)); SBC=$3,771K; capex=$2,112K; revenue grew YoY ($104,361K→$139,375K, +$35,014K); using the legacy-era capex ratio (mean capex/revenue 2016–2021=6.05%), growth capex=6.05%×35,014=$2,118K > capex, so maintenance capex=$0. OE=(1,054)+1,420−3,771−0=−$3,405K; diluted shares=24,099,438; OE/sh=−$0.141. Reconciliation: NI(−14,565)+D&A(10,213)+SBC(3,771)+other non-cash(947, reduction of ROU asset)+ΔWC(−1,420)=−1,054=CFO (matches). Pre-transformation legacy business; not used in the valuation anchor. Source: FY2019 10-K, accession 0001564590-20-009181.
2018 -$0.72 ▼
OE = CFO − ΔWC − SBC − maintenance capex. CFO=$(8,654)K; ΔWC=$540K (AR (1,723); Inv 1,597; Prepaid 261; AP 1,557; Accrued (2,056); Deferred rev 810; Other liab 94); SBC=$4,302K; capex=$3,593K; revenue declined YoY ($111,631K→$104,361K) so growth capex=$0, maintenance capex=capex=$3,593K. OE=(8,654)−540−4,302−3,593=−$17,089K; diluted shares=23,738,852; OE/sh=−$0.720. Reconciliation: NI(−34,440)+D&A(10,787)+SBC(4,302)+other non-cash(10,157: impairment of construction in progress 7,356 + provision for bad debt 2,922 + lease incentives (121))+ΔWC(540)=−8,654=CFO (matches). Pre-transformation legacy business; not used in the valuation anchor. Source: FY2018 10-K, accession 0001564590-19-006884.
2017 -$0.61 ▼
OE = CFO − ΔWC − SBC − maintenance capex. CFO=$(4,606)K; ΔWC=$(1,472)K (AR (9,159); Inv 3,953; Prepaid 411; AP 1,269; Accrued 1,821; Deferred rev 261; Other liab (28)); SBC=$5,091K; capex=$6,118K; revenue declined YoY ($117,738K→$111,631K) so growth capex=$0, maintenance capex=capex=$6,118K. OE=(4,606)+1,472−5,091−6,118=−$14,343K; diluted shares=23,390,235; OE/sh=−$0.613. Reconciliation: NI(−19,321)+D&A(10,753)+SBC(5,091)+other non-cash(344, provision for bad debt 455 + lease incentives (111))+ΔWC(−1,472)=−4,606=CFO (matches). Pre-transformation legacy business; not used in the valuation anchor. Source: FY2017 10-K, accession 0001564590-18-004115.
2016 -$0.64 ▼
OE = CFO − ΔWC − SBC − maintenance capex. CFO=$(578)K; ΔWC=$(4,377)K (AR +3,089; Inv (6,336); Prepaid (19); AP 105; Accrued (2,178); Deferred rev 362; Other liab 600); SBC=$5,313K; capex=$13,216K, treated entirely as maintenance (no reliable prior-year revenue base on the current tag to compute growth capex). OE=(578)+4,377−5,313−13,216=−$14,730K; diluted shares=23,139,807; OE/sh=−$0.637. Reconciliation: NI(−12,023)+D&A(9,853)+SBC(5,313)+other non-cash(−1, 'Other' line)+ΔWC(−4,377)=−578=CFO (matches). Note: predates the thermal-barrier/EV business; not used in the valuation anchor. Source: FY2016 10-K, accession 0001564590-17-003151.

Owner's earnings per share by fiscal year, most recent first. Tap a row to see how that figure was calculated, including the source filing.

Sales geography
Primarily United States (about 63% of 2025 revenue), with the balance to Latin America (~18%), Europe (~7%), and Asia (~11%, including a Chinese contract manufacturer used for extra production capacity rather than for sales booking).
Historical growth strategy

We don't have historical growth strategy information for this company yet.

Chart analysis

We don't have chart analysis for this company yet.

Competitors

We don't have competitor information for this company yet.

Circle of competence

We don't have circle of competence information for this company yet.